Mortar sculpting for a steel garage

A ready-made steel garage before the work Before
Garage finished in an antique-brick look with mortar sculpting and aging paint Finished
*A real project: a ready-made steel garage, prepared with a base treatment, then hand-sculpted in mortar and aged with paint into an antique-brick look.

Steel door preparation and painting

Steel door with its dents and scratches filled with putty (left) and the door finished in white (right)
Steel door with its dents and scratches filled with putty (left) and the door finished in white (right)

Woodgrain elevator renovation

Elevator doors and car interior refinished in wood grain (top: before, bottom: after)
Elevator doors and car interior refinished in wood grain (top: before, bottom: after)

More project examples

Photographs and documented work. Locations and durations are shown only where confirmed by records.

Bedroom with a green wall and a wood-grain ceiling

A third-floor apartment, renewed from interior to fixtures

Location
Warabi
Duration
Mid-May to late June 2026 (about 6 weeks)
Work
Demolition / electrical wiring / relocating water, drainage and gas / substrate and interior doors (LIXIL) / new wallpaper and cushion flooring / kitchen installation

Work that will be concealedRelocation of water, drainage and gas services; substrate work.

Follow day-to-day work on our official Instagram
Bedroom with storage and a window

Japanese-style rooms turned Western-style: two second-floor apartments

Location
Warabi
Duration
Mid-February to end of April 2026 (about 10 weeks)
Work
Removing partitions and closets / Japanese-style rooms to Western-style / kitchen, unit bath, washbasin and toilet (LIXIL and others) / rerouting water, drainage and gas pipes / wallpaper and sound-insulating floors in all rooms / doors and storage

Work that will be concealedRerouted water, drainage and gas pipes; sound-insulating flooring.

Follow day-to-day work on our official Instagram
Around the bathroom after replacing the damaged sill

Fixing a pre-owned house from under the floor

Location
Tachikawa
Duration
June to August 2026 (about 3 months)
Work
Bathroom to a unit bath (LIXIL) / replacing the damaged sill and pouring a slab / new kitchen, toilet, washbasin and water heater / distribution board / interior (wallpaper, floors, Japanese-style room)

Work that will be concealedReplacement of damaged sill timbers and concrete floor work.

Follow day-to-day work on our official Instagram
Water supply, hot water and drainage under the kitchen sink

Water, drainage and gas piping in a condominium

Location
Wako
Work
Water supply, hot water and drainage piping / gas piping and fixture installation (kitchen, bath, toilet) / shut-off and gas valves

Work that will be concealedCold/hot water, drainage and gas piping, with water and gas shut-off valves.

Follow day-to-day work on our official Instagram

All photos are published with the owners' consent.

Contact us on LINE@720lnuik

* You can start with just one photo (we give the formal price after a site survey). We won't pester you with sales messages.